Tel +90 216 416 78 53 / elektra@elektramuhendislik.com

BOSCH BUP1 FARADAY CAGE PROJECT

Year: 2024

Place: Nilüfer, Bursa / Türkiye

Closed Area: 270.000 m²

Installed Power: 94600 kVA

Employer: Bosch Sanayi ve Tic. A.Ş.

Explanation: Updating the Faraday cage system in all areas of 3 campuses in line with IEC62305 and making lightning protection calculations. Asbuild project studies and preparation of installation load project file for earthquake analysis.