EuroHP Factory

EUROHP FACTORY Year: 2024 Place: Çatalca, İstanbul / Türkiye Closed Area: 33.000 m² Installed Power: 2500 kVA Employer: Eurohp Isı Pompası A.Ş. Explanation: Heat Pump Equipment Production Facility; High voltage, low voltage and low current installations Application project service and tender dossier preparation works.
Sanko-4 Yarn Factory

SANKO-4 YARN FACTORY Year: 2022 Place: Gaziantep / Türkiye Closed Area: 92.000 m² Installed Power: 8×2000 kVA Employer: Sanko Tekstil A.Ş. Explanation: Integrated spinning mill; High voltage, low voltage and weak current installations application project service and tender dossier preparation works
Rexroth Bursa Logistics Facility

REXROTH BURSA LOGISTICS FACILITY Year: 2024 Place: Çatalca, İstanbul / Türkiye Closed Area: 10.667 m² Installed Power: 2×1600 kVA Employer: Rexroth Otomasyon A.Ş. Explanation:Logistics facility integrated into the existing Bursa Rexroth factory; High voltage, low voltage and weak current installations, application project service and tender dossier preparation works.
Altınay Aviation Production Facility

ALTINAY AVIATION PRODUCTION FACILITY Year: 2022 Place: Nilüfer, Bursa / Türkiye Closed Area: 12.500 m² Installed Power: 1000 kVA Employer: Altınay Savunma Teknolojileri A.Ş. Explanation: Defense industry equipment facility; High voltage, low voltage and weak current installations application project service and tender dossier preparation works.
ERA Defense Systems Manufacturing Facility

ERA DEFENSE SYSTEMS MANUFACTURING FACILITY Year: 2022 Place: Nilüfer, Bursa / Türkiye Closed Area: 1.500 m² Installed Power: 400 kVA Employer: Era Savunma A.Ş. Explanation: Defense industry equipment typesetting facility; Low voltage and weak current installations application project service and tender dossier preparation works.
Hadımköy Metkap

HADIMKÖY METKAP Year: 2021 Place: Hadımköy, İstanbul / Türkiye Closed Area: 80.000 m² Installed Power: 14×1600 kVA Employer: Akyapı – İdakon Ortaklığı Explanation: Workplace project with metal plating workshop + shop andsocial areas of various sizes. Electrical Application projectsand tender dossier preparation works.
Yapı Kredi Bankası Head Office Building

YAPI KREDİ BANKASI HEAD OFFICE BUILDING Year: 2019 Place: Levent, İstanbul / Türkiye Closed Power: 29.000 m² Installed Power: 9500 kVA Employer: Yapı Kredi Bankası Explanation: Adaptation of the fire alarm system according to currentregulations, re-design, management of the tender processand consultancy services.
Kale Industry Inc. Factories

KALE INDUSTRY INC. FACTORIES Year: 2015 Place: Çerkezköy, Tekirdağ / Türkiye Closed Area: 90.000 m² Installed Power: 6×1600 kVA Employer: Kale Endüstri Holding A.Ş. Explanation: The units of new production and management areas, factory, facilities and administrative building within the KALE Industry Inc. ; Designing projects of all areas High current, weak current installations and […]
BSH Çerkezköy

BSH ÇERKEZKÖY Year: 2012 Place: Çerkezköy, Tekirdağ / Türkiye Closed Area: 15.500 m² Installed Power: 2×2500 kVA Employer: B/S/H. A.Ş. / Ateş Mimarlık Explanation: In existing facility-small household appliances factory facilities;Office and production departments;electrical systems designing,preparation of tender documents and to have the designs certified by the concerned offices.
Bosch Rexoth A.Ş.

BOSCH REXROTH A.Ş. Year: 2005 – 2011 Place: OSB, Bursa / Türkiye Closed Area: 90.000 m² Installed Power: 12×1600 kVA Employer: Rexroth Otomasyon A.Ş. Explanation: BU400, BU500 and Gebze facilities; Designing all electrical systems project of factory and administrative building,tender document preparation works and getting approval from government authority.