Telateks Inc. Co.

 

Year / 1996
Location / Tuzla, İstanbul / Türkiye
Installed Power / 1x1000kVA
Closed Area / 14.500 m2
Employer / Telateks A.Ş.
Explanation / Additional tela production establisment: 1x1000kVA, 14.500m² Designing 34,5/0,4 kV electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, getting their approvals from public offices.

Toprak Inc. Co.

 

Year / 1996
Location / Eskişehir / Türkiye
Installed Power / 4x1600kVA
Closed Area / 45.000 m2
Employer / Siemens Inc. Co.
Explanation / Yeni küvet fabrikası ve yardımcı tesisleri: 4x1600 kVA, 45.000m² 31,5/0,4 kV - Fabrika enerji temini, kuvvetli akım tesisatları işlerinin projelendirilmesi ve enerji bakanlığı onay işlerinin yaptırılması.

Arçelik Inc. Co.

 

Year / 1996
Location / Eskişehir / Türkiye
Installed Power / 2x1600kVA
Closed Area / 25.000 m2
Employer / Siemens Inc. Co.
Explanation / Additional plastic, comresor ana refrigerator factory: 2x1600kVA, 25.000m² Designing 31,5/0,4 kV electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, getting their approvals from public offices.

Alkim Holding Paper Factory

 

Year / 1997
Location / Kemalpaşa, İzmir / Türkiye
Installed Power / 2x2500kVA
Closed Area / 27.500 m2
Employer / Siemens Inc. Co.
Explanation / Kuşe kağıt fabrikası ve yardımcı tesisleri: 5x2500kVA, 27.500m² İdare binası ve güç tesisleri: Kuvvetli akım ve zayıf akım tesisatları elektrik işlerinin projelendirilmesi, keşif metraj listelerinin hazırlanması ve enerji bakanlığı onay işleri

Ferro Döküm Inc. Factory

 

Year / 1997
Location / Tuzla, İstanbul / Türkiye
Installed Power / 20.000kVA
Closed Area / 35.000 m2
Employer/ Siemens Inc. Co.
Explanation / Additional induction furnuture establisment: 20.000 kVA, 35.000m² Designing 34,5 kV electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, getting their approvals from public offices .