Arakli Energy Production Facility

 

Year / 2019
LocationTrabzon
Installed Power / 15.000 kVA 
Closed Area / 22.000 m2
EmployerEvra Enerji
Explanation / Solid waste disposal facility and power generation facility from landfill gas around Trabzon-Rize. Preparation of 34.5/0.4 kV and 0.4/34.5 kV systems, electrical installation projects including indoor and inter-building infrastructures and tender dossier.

Silivri Seymen BES 154 kV TM additional

 

Year / 2020
Location / Silivri, İstanbul
Installed Power26.000 kVA
Employer İstaç A.Ş.
Explanation / İstanbul Metropolitan Municipality solid waste disposal facilities belong to the establishment of an additional 154/33.6 kV feeder and transformer center in order to supply the energy required for energy needs; preparation of electrical and construction projects, preparation of tender dossiers and obtaining Teiaş approvals.

Enerji SA Cogeneration Plant

 

Year / 1997
Location / İzmit / Türkiye
Installed Power / 52.000 kVA
Employer / Siemens Inc.
Explanation / Cogeneration establisment: 52.000 kVA Designing Co - gen establismentelectrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems.

Çayırhan Coal Plant (Section B)

 

Year / 1997
Location / Bolu / Türkiye
Installed Power / 7500 kVA
Employer / Siemens Inc.
Explanation / Energy supply Works and transformer substations: 7.500 kVA Designing 34,5/15/0,4 electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, getting their approvals from public offices.

Çayırhan Coal Plant (Section C)

 

Year / 1997
Location / Bolu / Türkiye
Installed Power / 8000 kVA
Employer / Siemens Inc.
Explanation / Energy supply Works and transformer substations: 8.000 kVA Designing electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, getting their approvals from public offices.